A soap plant is two plants under one roof: a soap line that saponifies, dries, mills and presses bars, and, if you want it, a detergent powder line with its own slurry and spray tower. The Soap & detergent tool takes four figures and lists every machine with a size, a quantity and the reason for it. It does not price anything: you enter your own rate against each line.

How the calculation works

The starting values are 20 tonnes of soap a day, 20 operating hours, 15 tonnes of detergent powder a day and 40% of the soap as toilet soap. The tool first works out three rates in kg/h:

  • Soap rate = soap tonnes × 1000 ÷ hours.
  • Detergent rate = detergent tonnes × 1000 ÷ hours.
  • Toilet soap rate = soap rate × toilet share ÷ 100.

The lines then follow these rules:

  • Continuous saponification reactor (SS 316), vacuum dryer for neat soap (30% moisture down to 12%), amalgamator, plodder and bar cutter, all at the soap rate. One reactor, one dryer, one amalgamator, one plodder and two cutter-stampers are always listed.
  • Two lye and brine tanks, each sized at 2% of the soap rate in m³, with a floor of 3 m³, rounded up to a stock size.
  • Three-roll refiner mills at the toilet soap rate, one per 1,200 kg/h, rounded up, with a minimum of one.
  • Two crutchers, one spray drying tower with its high-pressure pump and one post-dosing drum, all at the detergent rate.
  • Two soap wrapping lines at the soap rate, two powder filling lines at the detergent rate, and one set of steam, vacuum and chilled-water connections.

A worked example

Take the starting values.

  • Soap rate = 20 × 1000 ÷ 20 = 1,000 kg/h. Detergent rate = 15 × 1000 ÷ 20 = 750 kg/h. Toilet soap rate = 1,000 × 0.40 = 400 kg/h.
  • Reactor, dryer, amalgamator, plodder, cutters and wrapping lines are listed at 1,000 kg/h.
  • Lye and brine = 1,000 × 0.02 = 20 m³ for each of 2 tanks.
  • Refiner mill = 400 ÷ 1,200 = 0.33, so 1 mill.
  • Crutchers, spray tower, post-dosing drum and powder filling are listed at 750 kg/h.

Now raise the soap to 60 tonnes a day. The soap rate becomes 3,000 kg/h and the lye tanks 60 m³ each. At 40% toilet soap the rate is 1,200 kg/h, exactly one mill. At 70% it is 2,100 kg/h, and 2,100 ÷ 1,200 = 1.75 gives 2 mills.

Reading the result

Most lines are listed at the soap rate or the detergent rate, so the two outputs move different parts of the list. The toilet share changes only the refiner mill, because laundry soap does not go through it. Cutting the operating hours raises every hourly figure, not just one. The mill count steps up only when the toilet soap rate passes a multiple of 1,200 kg/h. Set the detergent to zero and the crutchers, spray tower, post-dosing drum and powder lines stay in the list at 0 kg/h rather than disappearing, so delete them from your quotation for a soap-only plant.

What the tool assumes and leaves out

  • It prices nothing and states no market prices. You supply the rate for each line.
  • The quantities of reactors, dryers, plodders, crutchers, spray towers and packing lines are fixed, not calculated. A very large plant may need two of a machine the tool lists once.
  • The reactor is always listed in SS 316. Other lines carry no grade choice.
  • Not in the list: the building, boiler house, fat and oil refining, glycerine recovery, raw material storage, effluent treatment, electrical supply and laboratory.
  • Motor power is not sized. For the drives, use the motor and gearbox selection calculator.

Common mistakes

  • Entering the soap as 20 when the plant makes 20 tonnes in a month. The field is tonnes a day.
  • Leaving the toilet share at 40% for a laundry-only plant, which adds a mill it will not use.
  • Leaving detergent at 15 tonnes when the plant will only make soap.
  • Using 24 hours for finishing lines that run two shifts.
  • Reading a listed quantity of one as a recommendation. It is a fixed starting allowance.

Try your own figures in the Soap & detergent plant calculator.