Reactors, tanks and pumps for a batch chemical plant
How the Chemical plant machinery tool sizes reactors, agitators, condensers, storage, pumps and pipe from the batch volume and batches a day, and how its rates are filled.
A batch chemical plant is usually described by two figures: how big a batch is and how many batches it makes in a day. The equipment list follows from those. The Chemical plant machinery tool turns them into a take-off of reactors and agitators, condensers and receivers, raw material, product and effluent tanks, pumps, pipe and valves. Each line has a size, a quantity and the basis it was sized on, and there is a rate column for pricing.
How the calculation works
With batch volume V in m³, batches per day N and charge or discharge time t in hours:
- Daily production (m³/day) = V × N.
- Pump flow (m³/h) = V ÷ t, the rate that moves one batch in the charge time.
- Reactor volume = V ÷ 0.75, rounded up to a standard size. The empty quarter is freeboard for the agitator vortex and any foaming. Two reactors are listed, so one can charge or discharge while the other reacts.
- Agitator = 0.5 kW per m³ of batch, rounded up to the next 0.5 kW, with a minimum of 1.5 kW.
- Condenser = 2 m² per m³ of batch, minimum 5 m². Distillate receiver = 30% of the batch.
- Storage: raw material = daily production × raw days, product = daily production × product days, each split over the number of tanks you choose (two by default). The effluent tank holds half a day of production.
- Pipe bore: the pump flow at about 1.5 m/s, rounded up to the next nominal bore.
Vessel and tank sizes are rounded up on a ladder of sizes a fabricator builds: 1, 1.5, 2, 2.5, 3, 4, 5, 6, 7.5, 10, 12, 15, 20, 25, 30, 40, 50, 60, 75, 100 m³ and upwards.
A worked example
The starting values are a 5 m³ batch, 4 batches a day, a charge time of 0.5 hours, 10 days of raw material and 7 days of product, with two tanks for each.
- Daily production = 5 × 4 = 20 m³.
- Reactor = 5 ÷ 0.75 = 6.67 m³, rounded up to 7.5 m³. Two of them.
- Agitator = 5 × 0.5 = 2.5 kW per reactor. Condenser = 5 × 2 = 10 m². Receiver = 5 × 0.3 = 1.5 m³.
- Raw material = 20 × 10 = 200 m³, so two tanks of 100 m³. Product = 20 × 7 = 140 m³, or 70 m³ per tank, so two tanks of 75 m³. Effluent = 20 × 0.5 = 10 m³.
- Pump flow = 5 ÷ 0.5 = 10 m³/h. At 1.5 m/s that needs a 48.6 mm bore, so the pipe is NB 50. There are three charging pumps (two duty, one standby) and two product transfer pumps, all at 10 m³/h.
Allow a full hour to charge instead and the pump flow halves to 5 m³/h, which needs 34.3 mm, so the pipe drops to NB 40. The reactors do not change, because they depend only on the batch.
Reading the result
Each line carries its basis, so you can see why it came out at that size. The reactors, condensers, receivers, product tanks, pumps, pipe and valves are SS 316. Raw material tanks are lined mild steel and the effluent tank is mild steel with an HDPE lining. The pipe is a starting allowance of 300 m with 30 ball valves, not a measured route. A unit with more than about 15 tonnes of steel is marked site-erected, because it cannot travel by road in one piece.
The tool holds no price list. In "Estimate for me" mode each rate = steel or steel-equivalent mass × your rate per kg of fabricated mild steel (× 3.2 for stainless) + install days × your labour rate per day. Both anchors are yours to set, and the values they start at are placeholders only. For example, each 75 m³ product tank works out at about 3,930 kg of 5 mm plate and 6 days of labour, so its rate is 3,930 × your steel rate × 3.2 + 6 × your day rate. In "Enter my own" mode you type every rate, and the total counts only the lines that have one.
What the tool assumes and leaves out
- The tool does not know your chemistry. SS 316 is a common default, not a corrosion assessment, so check every material against your process.
- The agitator figure suits a low-viscosity blend. Viscous or solid-laden batches need more power.
- Condenser area is a ratio to the batch, not a heat balance. For a real duty use the heat exchanger area calculator.
- Utilities, instrumentation and control, safety relief, structural steel and civil work are not listed.
- No figure is a market price. Check every estimate against supplier offers before you issue a quotation.
Common mistakes
- Entering the reactor size as the batch volume. The input is the working volume; the tool adds the freeboard.
- Deleting the second reactor to save money without checking the cycle. With one reactor every changeover is idle time, and fewer batches fit in a day.
- Setting a very short charge time, which raises the pump flow and the pipe bore for every transfer.
- Forgetting that storage days multiply daily production, so a long raw material holding gives very large tanks.
- Treating the 300 m pipe allowance as a measured length.
Run your own batch in the Chemical plant machinery tool. For condenser duty use the heat exchanger area calculator, and for an agitator's motor and gearbox the motor and gearbox selection tool.