Sizing a hexane extraction plant from daily seed tonnage
How the Solvent extraction plant tool turns seed tonnage, oil content, solvent ratio and solvent loss into extractor, desolventiser, recovery and safety equipment lines.
A hexane extraction plant is sized by two figures that are easy to confuse: how much seed goes in, and how much solvent circulates against it. The Solvent extraction plant tool takes the seed tonnage, operating hours, oil content, solvent ratio, solvent loss, oil-contact material and meal storage, and lists the preparation, extraction, desolventising and recovery equipment that follows. You then enter your own rate against each line.
How the calculation works
The starting values are 200 tonnes/day, 24 hours/day, 18% oil, a solvent to seed ratio of 1.1 : 1, solvent loss of 1.2 kg per tonne of seed, mild steel and 5 days of meal storage. Everything is worked from hourly flows:
- Seed per hour (kg/h) = tonnes/day × 1000 ÷ hours. Oil per hour = seed per hour × oil %, and crude oil flow (m³/h) = oil per hour ÷ 910. Meal per hour = seed minus oil.
- Solvent flow (m³/h) = seed per hour × solvent ratio ÷ 680, because hexane is taken as 0.68 kg per litre.
- Miscella flow (oil plus solvent leaving the extractor) = oil flow + solvent flow.
- Hexane storage (m³) = tonnes/day × loss × 7 ÷ 680 + solvent flow × 24 × 0.15, rounded up to a stock size. That is a week of make-up plus a working inventory.
- Meal silo (m³) = meal per hour × 24 × storage days ÷ 600, rounded up.
- Pipe bore is sized for 1.5 times the miscella flow at 1.5 m/s and rounded up to a nominal bore. Evaporator area = miscella flow × 9 m² (at least 10), and condenser area = solvent flow × 22 m² (at least 15).
Seed preparation (cleaner, cracking rolls, conditioner, flakers, expander) is sized on the seed per hour alone. The desolventiser-toaster and the meal handling are sized on the meal per hour.
A worked example
Take 300 tonnes/day, with the other starting values unchanged.
- Seed = 300 × 1000 ÷ 24 = 12,500 kg/h. Oil = 12,500 × 0.18 = 2,250 kg/h, which is 2.47 m³/h. Meal = 10,250 kg/h.
- Solvent = 12,500 × 1.1 = 13,750 kg/h, which is 20.22 m³/h. Miscella = 2.47 + 20.22 = 22.69 m³/h.
- Hexane storage = 300 × 1.2 × 7 ÷ 680 + 20.22 × 24 × 0.15 = 3.71 + 72.79 = 76.5 m³, so a 100 m³ tank size, quantity 2.
- Meal silo = 10,250 × 24 × 5 ÷ 600 = 2,050 m³, shown as 2,100 m³ (above 1,000 m³ the size rounds to the next 100), quantity 2.
- Miscella tank = 22.69 × 2 = 45.4 m³, so 50 m³, quantity 2. Pipe: 22.69 × 1.5 = 34.0 m³/h needs a 89.6 mm bore, so NB 100 mm.
- Evaporator = 22.69 × 9 = 204 m² for each of 2 stages. Condensers = 20.22 × 22 = 445 m², quantity 3. Vent gas absorption is flagged at 300 × 1.2 = 360 kg/day at risk.
The hexane line is worth a second look: the loss allowance is only 3.7 m³ of the 76.5 m³. The working inventory of circulating solvent dominates the tank size.
Reading the result
The solvent ratio moves far more of the plant than its single field suggests. It sets the solvent flow, and through it the miscella tanks, pumps, pipe bore, evaporators, condensers and the water separator. Oil content, in contrast, mainly shifts the split between oil and meal. Solvent loss changes the hexane make-up and the figure beside the vent absorption line, which is simply seed tonnage × loss in kg/day. The basis column on each line shows the arithmetic behind the size, so read it before you enter a rate.
What the tool assumes and leaves out
- It prices nothing. You supply the rate for each line and no market prices are built in.
- Densities are fixed: hexane 680 kg/m³, crude oil 910 kg/m³ and meal 600 kg/m³ in the silo.
- Several quantities are allowances, not calculations: 2 cracking rolls, 2 flaking mills, 6 sealless pumps, 700 m of pipe and 70 valves. Pipe length is not a route.
- The material choice (mild steel or stainless) applies to the oil and miscella contact lines such as the miscella tank, evaporators, stripping column, crude oil tank and pipe.
- Boiler, cooling water, electrical supply, civil work, buildings and hazardous-area engineering are not in the list. Nitrogen blanketing and gas detection appear as one line only.
- The plant is assumed to be a continuous loop or belt extractor. It does not model a batch extraction.
Common mistakes
- Entering the oil you want as the seed tonnage. The input is seed or cake into the plant.
- Using a solvent ratio quoted by volume or on a different basis, when the tool wants kg of hexane per kg of seed.
- Entering the loss of an ideal plant. Under 1.5 kg per tonne is a well-run plant, and the hexane line and vent system follow your figure.
- Setting operating hours below 24 for a plant that will run continuously, which inflates every hourly size.
- Treating the 700 m of pipe and 70 valves as a design rather than a starting allowance.
Try your own figures in the Solvent extraction plant calculator. For the oil side before extraction, see the cooking oil and ghee mill calculator, and to check a line, the pipe size and pressure drop calculator.