Skip to content

Runs in your browser

Cold storage

Enter the tonnage the store holds, how cold it runs and how much comes in each day. The list below is what that implies — panels and doors, compressors, condensers, evaporators, racking and standby power — with a rate column you fill in yourself.

How this works →

Your figures

More rooms means more doors and evaporators, but you can run them at different temperatures.

Around 2 for potatoes and produce, -18 for frozen. Colder rooms need more insulation and more plant.

Palletised produce with gangways. Denser stacking needs a smaller building.

Warm product coming in is the biggest single heat load on most stores.

Material take-off

What to buy, at what size, and how many — worked out from the figures above.

Rates

Every line is estimated from those two figures: its steel — or steel-equivalent — mass at the steel rate, stainless at 3.2×, plus its install days at the labour rate. There is no price feed behind this, so the two anchors are seeded from typical Pakistan figures as of September 2026 and are yours to correct. Type over any individual rate and yours is used instead.

Insulated envelope

  • PUF sandwich panel, 100 mm

    4 chambers of 1,563 m³, walls, roof and floor

    Rate from 36,625 kg + 40.69487747838002 days labour — Panels, joints, trims and sealing
    Size
    3,663 m²
    No.
    1lot
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 14,751,893
  • Insulated floor with screed and vapour barrier

    Vapour barrier under the insulation, screed over it

    Rate from 4,937 kg + 12 days labour — Insulation, barrier, screed and heating where needed
    Size
    449 m²
    No.
    1lot
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 2,004,898
  • Insulated sliding door

    One personnel and one loading door per chamber

    Rate from 320 kg + 1.5 days labour — Leaf, track, gasket and heater tape
    Size
    100 mm, 2.4 × 2.6 m
    No.
    8door
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 1,054,000
  • Dock leveller and shelter

    Keeps the cold in while a truck is loaded

    Rate from 1,400 kg + 4 days labour — Leveller, hydraulics, shelter and bumpers
    Size
    6 tonne
    No.
    2bay
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 1,140,000

Refrigeration

  • Screw compressor pack

    29 kW through the envelope plus 47 kW pull-down, at 35% margin

    Rate from 4,276 kg + 8 days labour — Compressor, motor, oil separator, panel and skid
    Size
    103 kW total
    No.
    2pack
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 3,460,526
  • Evaporative condenser

    Heat rejected is the duty plus the compressor work

    Rate from 2,641 kg + 6 days labour — Coil, fans, pump, sump and water treatment
    Size
    134 kW rejected
    No.
    1unit
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 1,071,295
  • Air cooling unit (evaporator)

    Two per chamber, so one can defrost while the other holds temperature

    Rate from 632 kg + 3 days labour — Coil, fans, casing, drain and defrost
    Size
    26 kW per chamber
    No.
    8unit
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 2,080,952
  • Refrigerant piping, insulated

    Suction, liquid and hot gas to each chamber

    Rate from 5 kg + 0.12 days labour — Pipe, insulation, cladding and supports, per metre
    Size
    480 m
    No.
    480m
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 1,008,000
  • Liquid receiver and accumulator

    Holds the charge and protects the compressor from liquid

    Rate from 742 kg + 4 days labour — Pressure vessel with valves and safety
    Size
    1.5 m³ · 0.46 t each
    No.
    2vessel
    Total weight
    0.93 t
    Rate(estimated)
    Amount
    ₨ 613,320

Racking, controls & power

  • Pallet racking, galvanised

    About 900 kg a pallet position

    Rate from 137,778 kg + 10 days labour — Uprights, beams, footplates and bracing
    Size
    2,222 pallet positions
    No.
    1lot
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 55,136,111
  • Control panel, temperature monitoring and alarms

    Recorded temperatures are a condition of most produce contracts

    Rate from 1,220 kg + 8 days labour — PLC, sensors, recorder, alarms and SCADA
    Size
    4 chambers
    No.
    1system
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 508,000
  • Standby generator

    A store that loses power for a day loses its contents

    Rate from 2,958 kg + 6 days labour — Engine, alternator, canopy, tank and ATS
    Size
    165 kVA
    No.
    1set
    Total weight
    —
    Rate(estimated)
    Amount
    ₨ 1,198,279

Material

₨ 83,506,537

0.9 t of steel to fabricate

Labour

₨ 520,737

208 days at ₨ 2,500 a day

Quotation total

₨ 84,027,274PKR

12 of 12 lines priced

0.93 t is fabricated steel only. 11 bought-in lines — pumps, machines, proprietary units — are priced but carry no steel weight of ours, and show a dash in the weight column.

Questions

How is the refrigeration duty calculated?
Heat through the envelope, plus the pull-down on warm product arriving, plus a margin for lights, fans, doors and people. Transmission comes from the panel area and the temperature difference; the product load comes from the daily intake, which on most stores is the larger of the two.
Why does daily intake matter more than capacity?
Because a full store that is not receiving anything needs very little plant — only enough to hold against the heat leaking in. It is chilling warm produce down that sets the compressor size, so a store taking in five percent a day needs far more refrigeration than one taking in one percent.
What changes below minus ten degrees?
Panel thickness goes from a hundred to a hundred and fifty millimetres, the floor needs underfloor heating or the ground beneath it heaves, doors need heated frames, and the compressors go two-stage. The take-off switches all four automatically when you set a frozen temperature.
What is not included?
The building shell and foundations, the electrical supply to the plant room, fire protection, materials handling equipment, and the land. The panels quoted here are the insulated envelope inside your structure, not the structure itself.